RAIL
Concrete Canvas® (CC) has been used in the rail sector since 2009 and is rapidly establishing itself as the construction material of choice with network providers around the world.
The speed and ease of installing CC means it is well suited to time-critical track-side work, reducing line possession and improving safety. Eliminating issues associated with rebound from shotcrete, and the large plant and equipment required for traditional concreting methods means rail works can continue without line closures. CC is BBA certified with a durability in excess of 120 years when used in erosion control applications.
For more Rail downloads, click here: