Over 5 years of R&D investment has enabled the replacement of our standard CC series with the new CC T-series. This has reduced lifecycle carbon emissions by approximately 30% and improved performance, particularly abrasion resistance.
In 2018 we introduced a modified PVC formulation to reduce coating polymer use by 30%.
We have replaced 70% of our petrol/diesel company vehicles with electric vehicles.
Through the Royal Academy of Engineering Welsh Valleys Engineering Project, we are supporting education and innovation in secondary schools in the South Wales area.
Awarded ISO14001 certification (2022) to assist in minimising negative environmental impacts and ensuring compliance with the regulation.
Commissioned a 1.1 MWp solar array covering most available roof area of the factory which will generate 60% of predicted site consumption. This is scheduled to come on line by June 2023.