In July 2018, CC was specified for use on a second installation for West Sussex County Council and Balfour Beatty Living Places, carried out by Suttle Projects.

The project required the lining of three culverts, which sit under the A272 and direct the river Rother below the highway at Halfway Bridge.

The culverts had degraded due to sediment flow, with one culvert in particular suffering reduced capacity as a result of the silt build up.

Each of the three 32m long culverts was cleaned and lined over 8 days. Despite the 8 day working time for each culvert, the project was completed ahead of schedule.

CC will prolong the culverts’ life and mitigated the need to completed replace the assets, saving time and costs for the client.